Electrician in Stari grad

Turn-of-the-century buildings, listed properties and wiring in layers — in Stari grad you measure before you chase.

Response time: 30–60 minutes

In Stari grad the wiring is the oldest in the city and access the most constrained. Together that means more measuring and planning here than chasing.

What we find

Wiring from several periods in the same flat. The original from when it was built, a replacement from the sixties, a partial one from the nineties, and something recent. The layers are invisible until something is opened, so nothing here gets estimated from the look of the board.

Cloth insulation. On the oldest sections the insulation crumbles at a touch. That is the one finding where we do not plan in stages, only agree a date.

Aluminium and copper on the same joint, without a proper connector. Corrosion there is a slow process ending in overheating, and it is the most common cause of scorched outlets in this part of town.

Junction boxes buried or painted over. Finding a fault can therefore take longer than fixing it; that is why on larger jobs we return every box to an accessible position and photograph the routes before closing up.

Constraints we respect

In listed buildings and with original joinery we often use surface conduit following existing lines rather than chasing. It is not prettier, but it is the only approach that leaves alone what must be left alone.

What we do most

Diagnostics — because here the cause is rarely visible without measurement — replacing scorched outlets, and reworking the board as the first stage of larger work.

Response time

Dorćol, Skadarlija, Kosančićev venac, Terazije — usually 30 to 60 minutes. The very centre can be slower because of parking rather than distance.

Common questions

The building is listed. What is allowed?

Inside the flat, usually anything that does not touch the structure or the original joinery — but in listed buildings we often run surface conduit rather than chasing. We agree the approach before starting.

The wiring is from several periods. Can it be done in stages?

It can, and usually is. Board and critical circuits — kitchen and bathroom — first, the rest when the opportunity comes. What matters is measuring and surveying what exists before any of that.

I have found old wiring with cloth insulation. How urgent is it?

Cloth insulation that crumbles when touched is for replacement, not for postponing. It is the one finding where we do not discuss stages, only dates.

Do you cover Dorćol, Skadarlija and around Kalemegdan?

Yes, all of Stari grad — Dorćol, Skadarlija, Kosančićev venac, around Kalemegdan and Terazije.

Most requested in Stari grad

Other areas