Electrician in Rakovica

Miljakovac, Kanarevo and Petlovo brdo — seventies and eighties blocks built on slopes, with their own set of faults.

Response time: 45–75 minutes

Rakovica is mostly blocks, built on slopes, with an industrial legacy at the foot.

Miljakovac, Kanarevo brdo, Petlovo brdo, Labudovo brdo

Seventies and eighties stock, standard designs. As elsewhere from that period the boards have no RCD, and the kitchen circuit was built for a cooker and little else.

What is specific here is the ground. The buildings sit on slopes, so ground floors and cellars are partly buried and noticeably damper than the rest. Junction boxes and boards in those parts age faster than the same fittings two floors up — insulation gives gradually, and it only shows in measurement.

That is why work here often starts with measurement per circuit before any job is agreed.

The shared riser

In some buildings the problem does not come from the flat. When measurement shows a voltage drop that the flat's load cannot explain, the cause is the shared run above the meters. The report then goes to the building manager — that is not a job solved behind the flat door, and it is fair to say so at once.

Industrial legacy

The foot of Rakovica has buildings converted from former plants. Three-phase distribution there is sized for machines long gone, so moving into a unit usually means adapting the distribution to the new use, with the load balanced across phases.

Response time

Miljakovac, Kanarevo brdo and Petlovo brdo 45 to 75 minutes. Resnik and Kijevo at the upper end.

Common questions

Do you work in Miljakovac and Kanarevo brdo?

Yes, that is most of the work in Rakovica. The blocks are seventies and eighties, built to standard designs, so the same fault repeats across several buildings.

Voltage drops when neighbours switch on heavy loads. Is that my problem?

Most likely not. Measurement shows whether the drop originates in the flat or in the shared riser. If it is the riser you get a report with numbers for the building manager — it cannot be solved inside the flat.

What is specific about buildings on a slope?

Ground floors and cellars are often partly buried, so they are damper than the rest of the building. Junction boxes and boards in those parts age faster, and that only shows up in insulation measurements.

Do you work in units in the old industrial area?

We do. Spaces converted from former plants have three-phase distribution built for machines long gone — that gets adapted to the new use rather than built from scratch.

Most requested in Rakovica

Other areas