New consumer unit with two rows of circuit breakers
A new panel — a breaker for every circuit

An electrician in Beograd

Same-day call-outs. I tell you what I see and what it costs before I touch a cable.

  • Licensed and insured
  • 14 years of experience
  • Over 900 call-outs
  • Reply under 30 minutes

Urgent fault? Call now — don't plug anything else into the mains.

If you see smoke or smell burning plastic, switch off the main breaker and call us. We answer 24/7 across Beograd.

Real prices.
Before we ring the doorbell.

The final price depends on the actual state of the installation and scope. We tell you what we see and quote before touching a cable.

I want a precise quote
ServiceFrom
Diagnostics
deducted from the repair price
from 2,000 RSD
Outlet replacement
from 1,500 RSD
Breaker replacement
from 2,500 RSD
Call-out
from 3,000 RSD
Panel rebuild
depends on circuits and protection
by assessment
New installation per point
from 1,800 RSD

The call-out fee is deducted from the repair if work is done during that visit. Materials are billed at cost with the receipt attached.

What the work looks like

Photographs from real call-outs. Nothing taken off the internet.

Before
Old consumer unit with three rows of ceramic screw fuses and hand-written labels
After
New consumer unit with three rows of circuit breakers
The same board in the same flat. Ceramic fuses on the left, a breaker per circuit on the right.
Living room with recessed ceiling spots and a linear wall light
Lighting laid out before the ceiling was closed
Chased channels in a wall with conduit and back boxes, before plastering
A new installation, before the wall is closed up
Warm LED strip set into the joint of a concrete garden wall at dusk
LED strip set into a garden wall
Café with track lighting, pendants and a wall light
A café — track lighting and pendants
Commercial kitchen wiring run in surface trunking above the counters
Commercial kitchen, wiring in surface trunking
Switches and surface trunking on a stone-clad wall
Trunking and switches on a stone wall

Fourteen years above someone's panel — usually right before something burns out.

I started rewiring my own flat in 2010 because two electricians gave me three different problems for the same fault. Since 2012 it's been my only job. Apartments, houses, shops, light industry — work where the test report matters more than the cheapest quote.

An electrician in a work shirt laying cable in a dug trench in a garden
Laying a supply in a trench. The work does not stop at the flat door.
  • Licensed electrician

    Member of the Chamber of Engineers, certificate available on request.

  • Calibrated instruments

    Insulation, RCD, loop impedance and earth resistance — calibrated yearly.

Years of experience
14
Completed jobs
900+
Average response time
under 30 minutes

“Show me the panel before you give a quote.” That's the whole philosophy. If we don't see it, we don't price it.

Send your problem.
Get an indicative price within an hour.

Photos beat descriptions. Snap the panel, the outlet, whatever's smoking — we'll do the rest.

  • No surprises in the quote
    Indicative price upfront. Final price after we see the install.
  • Emergencies get priority
    If the symptoms suggest fire risk, we automatically reorder the queue.
  • Documented work
    Every visit ends with measurements and photos of what was done.
Live risk assessment
Standard scheduling — usually within 1–2 days.
Low risk

We'll get back to you with an indicative price and the next available slot.

City / district
up to 8 files, compressed in browser

What people ask before they call.

How much is a call-out?

A call-out starts at 3,000 RSD and is deducted from the repair price if we do the work during that same visit. Send photos first and in most cases you get an indicative price before anyone sets off.

How quickly can you come?

We usually reply within 30 minutes. For genuine emergencies — a burning smell, a hot panel, sparking — we come out the same day, and within a couple of hours across most of Belgrade.

Do you warrant the work?

Yes, on everything we carry out. The warranty covers our work; installed materials carry their manufacturer's warranty. Every job ends with measurements and photo documentation, so there is a record of what was done and how.

Why do you ask for photos first?

Because a photo of the panel immediately shows the number of circuits, the type of protection, and whether the wiring is aluminium or copper. Those three things move the price more than anything else, so instead of guessing over the phone you get a range before anyone comes out.

How do I pay?

Cash or bank transfer, once the job is done. We quote before starting — no work begins until the price is accepted.

Do you travel outside the centre?

We cover all of Belgrade. Novi Beograd, Zemun, Voždovac, Vračar and Stari Grad have the shortest response times, but we go further out too — it just adds to the arrival time.