EV charger installation
Home EV charger (wallbox) installation: a dedicated circuit from the consumer unit, a type B RCD, an earthing check and power matched to your supply.
An EV charger is the only load in a home that draws full current for hours without a break. That is why it does not go on an existing socket: it gets its own circuit and its own protection.
What the installation covers
A survey before the quote. Meter, contracted power, consumer unit and the cable route to the charging spot. That tells us whether it is a single-phase or three-phase charger, and how powerful.
A dedicated circuit from the consumer unit. Nothing else on it, with the cable size worked out from current and run length. For garages and driveways, length is what moves the cable size most.
Protection in the consumer unit. A breaker for that circuit and an RCD of the right type. A charger can produce DC leakage current that an ordinary RCD does not see, so it takes a type B, or a type A if the charger has built-in DC detection. The charger manual states this, and we do not improvise on it.
Earthing, measured. A charger will not run without sound earthing, and it should not.
Mounting and commissioning. Charger on the wall or a post, maximum current set, a test charge with your car.
Single-phase or three-phase
A single-phase charger gives about 3.7 kW, which covers most daily driving overnight. A three-phase charger goes up to 11 kW but needs a three-phase supply. If you already have one, it is usually the better choice because the load is spread across three phases.
When the house has no headroom for another big load
Better chargers have load management: they watch total consumption and cut charging back on their own when the water heater, cooker or air conditioning switches on. The car charges a little slower and the main breaker stays in. That is often cheaper and quicker than raising your contracted power.
What to send us
A photo of the consumer unit, a photo of the meter and where you want the charger, with a rough distance from the consumer unit. If you already have a charger or a model in mind, tell us which. From that we tell you what is needed and what it costs.
Common questions
Can I charge my car from a regular socket?
Briefly and in a pinch, at reduced current. Charging runs at full current for hours, and an ordinary socket and the circuit behind it are not built for that. Daily charging needs a charger on its own circuit.
How powerful a charger can I install?
The limit is set by your contracted power and your supply, not the charger. Single-phase is realistically 3.7 kW, sometimes 7.4 kW; 11 kW needs a three-phase supply. We look at the meter and the consumer unit before quoting and tell you what your installation can carry.
Do I need to increase my contracted power?
Not always. A charger with adjustable current or load management slows charging when the water heater or cooker switches on, so the main breaker does not trip. If an increase is needed after all, we tell you up front.
Can I buy the charger myself and have you install it?
Yes. Just send us the model before you buy, so we can check whether it has built-in DC leakage detection and suits your supply. That decides which RCD goes into the consumer unit.
I live in an apartment building and park in a shared garage. Is it possible?
Technically yes, but the decision is not yours alone. Power comes from the building's shared supply, so the residents' association has to agree. We measure what the existing supply can handle and give you the figures for the meeting.